Defense & aerospace electronics

Resource Engineering Corporation

Airborne electronic hardware certification, digital design verification, and the documentation that has to survive an audit.

1.0Mission

Evidence is the deliverable

Resource Engineering Corporation produces the evidence that airborne and defense electronics do what their makers say they do. We work to the standard, document the work so it stands on its own under audit, and treat every client’s certification as if our own name were on it, because it is. When the hardware goes into service, the record behind it should be one we are both proud to sign.

Christopher Fitch President, Resource Engineering Corporation

2.0Capability

What the firm does

Resource Engineering Corporation is a single-engineer consultancy with roughly thirty years in FPGA and SoC design, verification, and defense electronics documentation. The work divides into three areas that are usually bought separately and often needed together.

Req → design → verification

Certification evidence

DO-254 design assurance for airborne electronic hardware at DAL A and DAL B: requirements capture and traceability, verification planning, elemental analysis, and evidence packages built for stage-of-involvement review.

Simulated eye · illustrative

Design and verification

FPGA and SoC development and verification in UVM and SystemVerilog. Constrained-random and directed testbenches, coverage closure, and high-speed transceiver design. At board level, mixed-signal and PCB design with signal and power integrity analysis.

AS9102B balloon drawing

Qualification documentation

MIL-STD-498 data item preparation, AS9102B first article inspection documentation, technical data packages, and source approval request packages for defense logistics and engineering support activities.

3.0Certification

Built for the audit, not after it

A DO-254 program is reviewed at four points. Evidence assembled in arrears costs several times what evidence captured as the design proceeds costs, and it rarely reads as convincing. The table below is the shape of the work.

Stage-of-involvement reviews and the record each one asks for
StageReviewEvidence produced
SOI #1PlanningPHAC, hardware development and validation plans, standards, tool assessment
SOI #2DesignRequirements and their traceability, conceptual and detailed design data, derived requirements with rationale
SOI #3Validation & verificationVerification procedures and results, elemental analysis, review and analysis records
SOI #4Final buildConformity review, configuration index, accomplishment summary

Independence

For DAL A and DAL B development, FAA AC 20-152A calls for validation activities to be performed with independence. At a small company, where the engineer who designed the logic is often the only one available to verify it, showing that independence internally is awkward to argue. An outside party makes it plain on the face of the record.

4.0Standards

Specifications worked to

Named here because these are the terms solicitations and capability searches actually use. Hover over or tap a category for what it covers.

  • DO-254
  • AC 20-152A
  • MIL-STD-498
  • AS9102B
  • DAL A
  • DAL B
  • Design assurance
  • Requirements traceability
  • PDRPreliminary Design Review
  • CDRCritical Design Review
  • First Article Inspection
  • Technical Data Package
  • Source Approval Request
  • UVMUniversal Verification Methodology
  • ASIC verification
  • SystemVerilog
  • VHDL
  • Verilog
  • FPGAField-Programmable Gate Array
  • SoCSystem on Chip
  • High-speed transceiver
  • Signal integrity
  • Power integrity
  • Mixed-signal design
  • PCB design
  • 541330Engineering Services
  • 541715Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)
  • 541380Testing Laboratories and Services

Review participation

Preliminary and critical design reviews, as presenter and as reviewer. A design review is where a certification argument is either credible or it is not, and it is worth rehearsing before the authority is in the room.

5.0Engagement

How the firm contracts

Subcontract to a prime
Available as a named subcontractor on SBIR, STTR and prime contracts, including at proposal stage. Suited to firms holding airborne hardware work without a standing certification process.
Corp-to-corp, hourly or fixed scope
Direct engagement for verification, documentation or design work. A discrete deliverable is as welcome as a long engagement, and is usually easier for both sides to justify.
Remote
The work is performed remotely as a matter of course. Travel for reviews and audits by arrangement.
Insured
Workers' compensation and general liability coverage in force. Certificates on request.

6.0Contact

Start with a short call

Twenty minutes is usually enough to tell whether there is a fit. Bring the program and the standard it has to meet.

NameChristopher Fitch, President
Emailchristopher.fitch@resourceengineeringcorp.com
Phone+1 (757) 615-4485
OfficeChesapeake, Virginia